X
GO

Tugce Birgen

Technical Assistance and Supervision for Giresun Wastewater Project

Beneficiary: Giresun Municipality
Project Start Date: 12/2021
Duration: 55 Months 
Status: Ongoing

The overall objective of the project is to accelerate Turkey’s accession to the EU by enabling Turkey to achieve a high level of environmental protection and compliance with the EU wastewater sector directives.

Print
2233

x